My Order

You are logged in as an admin Retrieve order
Update Order

{{item.label}}

{{item.label}}

No order found - please check order number and postcodeQuick Order

Cabinetry Quick Order

To build up your order quickly, you can use this quick order facility to set the overall sizes for the cabinetry you need. Detailed designing needs to be done by loading each cabinet into the Cabinet Designer tool but quick edits can be done here.

Your order is empty at the moment.

Go to the Cabinet Designer or Cabinet Planner tools to start building up your order.

For more information see Getting Started.

If you have already started an order and have an order number you can retrieve it Retrieve different order

Retrieve order
Admin
Reload order
DRAFT SUBMITTED MANUFACTURE COMPLETE

Metadata
Order {{ jobdata.cluid }}
The status of this order is {{jobdata.JStatus}}
You can continue to work on your designs and when ready to progress to the quotation stage press submit. Submit Order We will contact you shortly with a quotation for this order.
If you would like to continue working on this order, you can take it back to DRAFT and then submit again when ready Take order back to DRAFT
This order has not been saved yet. We recommend you save the order now - as a draft is fine - so that you get an order number allocated and then you will be always able to retrieve your work. Save Order >>

Save new order

We need to take a few details to start recording this order. Please provide all information as this is essential to contact you later in the ordering and delivery stages.

We'll never share your email with anyone else.
Postcode is very important for determining the type of delivery we can offer e.g. van, pallet, parcel etc
You will be glad you provided a telephone number when a delivery driver is 10 minutes away from dropping off 1000Kg of cabinetry to you!

We will save your order as a draft and you can continue to work on it. However if you are already happy with the order and want to progress to the quotation phase now then check this box.
We are unable to save the order. Please correct the following error(s) and press Save Order again:
  • {{ error }}
Your order is in manufacture

Your order has been quoted. The total cost is £{{ (Math.round(orderlist.jobdata.Quote*100)/100).toFixed(2) }}. To progress your order to the manufacture stage, please proceed to the payment page.

>>Go to payment page

Alternatively if you would like to make further changes to your order you must unquote it first

{{ jobdata.ProjectName }}
Choose a name for your project. This is useful when you need to keep track of several projects under different order numbers.
{{ jobdata.ProjectDescription }}
Optionally describe your project here.
Further order management options

If you have already started an order and have an order number you can retrieve it Retrieve different order

Retrieve order

If you want to create a new order based on this one or simply start over, select one of the options below.

(The current order under this order number will be unaffected.)

Start a new order with existing order items

Start a new empty order

  • Description
    Unit cost
    Total cost
  • {{ item.sortorder/10 }}

    Comments

    {{atob(item.cabgenorder.cabcomments)}}

    Shortname
    Quantity:
    Quantity:{{ item.qty }}
    Drawing group:
    Draw group:{{ item.drawgroup }}
    Location:
    Location:{{ item.location }}
    Drawing reference:
    Location:{{ item.drawingreference }}
    Unit cost {{ item.unitcost}}
    Total cost {{ item.unitcost*item.qty}}
    {{ item.sortorder/10 }}
    Quantity:
    Quantity: {{ item.qty}}
    Unit cost {{ item.unitcost}}
    Total cost {{ item.unitcost*item.qty}}
    {{ item.sortorder/10 }}
    Ad hoc panels as listed at end of order
    Quantity:
    Quantity: {{ item.qty}}
    Unit cost {{ item.unitcost}}
    Total cost {{ item.unitcost*item.qty}}
  • Total ex VAT
    {{ totalcost.toFixed(2) }}
  • VAT
    {{ VAT.toFixed(2) }}
  • Total inc VAT
    {{ totalincVAT.toFixed(2) }}

Please note that orders less than £300 may not be quoteable

Ad hoc panels

Ad hoc panels are extra panels you can order to help complete your project. Specify the material and dimensions and we will include them in the processing list for your order. If the material is one that you are already using in your cabinets and the quantity is small then the incremental cost will be minimal. If we need to use additional boards to satisfy the material demand of the ad hoc panels then there will be a price jump.

With most materials the finished visible edge will need edging. e.g the front edge of a shelf should be edged whereas the sides and back will not need edging. We term the front edge 'L1', the back 'L2' and the two edges at 90 degrees 'W1' and 'W2'. So a shelf would have edging on L1 whereas a panel to be used as a door would have all edges edged and be designated L1L2W1W2. A shorthand that can be used for 'L1L2W1W2' is 'EAR' which stands for 'Edged All Round'

Comments

Please include any additional specifications or comments:

Comments from Fortschritt Bespoke Cabinetry:

How to use

The Cabinet Combiner shows the cabinets in your order and allows you to move them around to see how they fit together to achieve your design.

An X, Y, Z coordinate system is used whereby X moves left to right, Y moves up/down (0 can be considered floor level) and Z is the position of the back of the cabinet. The first cabinet will be positioned at X,Y,Z being 0,0,0 which corresponds to the bottom back left of the cabinet. Red dotted lines show the zero points and axes.

Use the 'eye' option to choose the type of drawing projection. Note that the Z position can only be manipulated in the Plan projection as the Isometric projection by its nature has an ambiguity between X and Z.

The Z Order (determines which cabinet is drawn in front of another) can be adjusted by double clicking a cabinet to bring it to the front.

Use the 'save cabinet postions' option to persist your positions.

Draw Group A

Draw Group B

Draw Group C

Draw Group D

Draw Group E

Draw Group F

Plan